2022
PHASE I SEWER REHABILITATION
CLIENT: CITY OF WIGGINS

Tice Engineering was hired by the City of Wiggins to plan, design and oversee construction of improvements of the existing sewer system. The project kicked-off with the development and approval of a sewer facilities plan. Once the facility plan was approved, the City was awarded a State Revolving Loan and TEI moved into the design phase. The design includes the rehabilitation of approximately 9,000 linear feet of sewer line. Areas of the existing line are more than 50 years old and carry approximately one-third of the city’s sewer to a nearby treatment facility. The project required coordination with the regulatory agencies during design which will continue through construction.

SCOPE OF WORK INCLUDED:
Preparation of a facilities plan, including public hearing and approval

Survey of existing infrastructure

Prepared design drawings for proposed improvements

Railroad permitting

MDOT right-of-way permitting

Bidding services for sewer system improvements

Construction administration

Construction inspection

Previous
Previous

US 49 at Oak Lane, Harrison County

Next
Next

US 49 at Biloxi River & SR 15 at Tchoutacabouffa River, Harrison County, MS