2014
FLORIDA GAS TRANSMISSION

Tice Engineering was selected to perform the following tasks:


Obtain all necessary information from Florida Gas Transmission that pertains to the proposed project.
Provide final As-Built Plans created with CADD software for the Oil/Water Separator constructed location.
Provide final As-Built Plans created with CADD software for the Cooling Tower constructed location.
Review plans and submit to Florida Gas Transmission for review.
Address any corrections and provide an electronic hard copy of final plans.

Previous
Previous

Blaylock Park Stage Pavilion

Next
Next

C Spire Wireless